What's new in Sendr v3.1

v3.1 brings a batch of updates across sequences, onboarding, pages and infasturcture. We've grouped everything by area, so jump to whatever's most useful to you.
Build sequences with AI 🤖
Use AI to build your sequences. Write in natural language what you're trying to do and it'll build the whole flow for you, steps, timing and all. The fastest way from blank canvas to a working sequence, and the easiest way in if you've never built one.

Tip - Include a voice note step. We’ve seen significant results with sending voice notes across LinkedIn DMs and WhatsApp. Drop a voice note straight into a sequence. A real voice partway through an outbound flow cuts through in a way text can't.
We are cooking up something very exciting with Campaign Copilot coming soon… Picture the lovable for GTM 👀
A fresh start when you sign up ✨
Rebuilt onboarding. We rebuilt onboarding from the ground up: clearer steps, live previews, and validation as you go, so new users are set up right the first time. Sign-up + login got the same polish and we are working on a new feature that analyses your website and builds out persona profiles for you to use across Sendr.

Personalised Pages, your way 🏷️
Make pages feel like yours. Set a custom author name on page templates, and hide the "Created by" line entirely if you'd rather.
Watch your rows run. Running rows on a page now shows live progress and validation as it goes, so you can see what's happening.
Video processing speed. We’ve upgraded our infrastructure to speed up processing of video uploads and recordings by 12x.
Channels 🔌
Connect up to 100 accounts. The channel picker now loads up to 100 connected accounts, so larger teams see everything in one place.
Fixes 🐛
Save button on the first email step. If a sequence opened with an email step, Save could stay stuck even when it was complete. Fixed.
PDF attachment filenames. Attachments were losing their names after save and reload. They now stick.
Line breaks in email variables. Text pulled in through variables now keeps its line breaks instead of running together.
Stop on reply in analytics. Now reflected correctly in completion analytics.
Page templates load reliably. Fixed a case where a template could hang on an endless spinner.
Lipsync and video previews. Now load reliably instead of occasionally dropping.
Data Studio typing. The first character you type into a cell is no longer dropped.
Under the hood ⚙️
We reworked how sequences query data (noticeably faster on large campaigns), tightened up send scheduling reliability, made subscription status more self-correcting, and shipped a stack of smaller improvements you won't see but will feel.